Lenexa City Center Library

Lenexa City Center Library

In association with Holzman Moss Bottino Architecture

LENEXA, KANSAS

  • Johnson County Library System
  • New Construction
  • 40,000 SF
  • $15 Million

The new Lenexa City Center Library is a source of inspiration, innovation and experiences that will enrich the surrounding community.

Located in the heart of Lenexa’s contemporary city center, this development is helping establish a new downtown for the city. Adjacent to a city hall, community center, restaurants and public market, the library welcomes all members of the community.

To achieve total flexibility, the majority of the library is an open loft-like space that houses the adult, teen, and juvenile collections on two levels. A two-story atrium serves as the living room for the community. Three large flexible meeting spaces and four smaller meeting spaces can be utilized by both library staff and community members and will provide access to technology for community groups, tutoring, and collaborative discussions. Patron convenience is at the forefront of the library’s automated conveyance system that allows patrons to both pick up holds and drop off returns via a drive-thru in the parking garage. The new library incorporates a service model designed to enhance public access to the collections, focus services to patrons, and integrate patron self-service strategies and staff mobility.

This new library is meant to engage the community. The Community commons visually connects to the civic plaza, street, and public market. The upper and lower entries allow for ease of patron access from both the Civic Center and Public Plaza.

Thirty-foot high towering glass and zinc shingled walls fold across two sides of the building and allow for connectivity between the outdoor plaza and library patrons. These folding walls are unified by a curving railing that weaves between the interior and exterior of the building. This ribbon-like railing draws patrons walking along the public plaza toward the library’s two entrances.

Metropolitan Community College-Engineering Technology Center

MCCEtec1

Metropolitan Community College – Engineering Technology Center

IN PROGRESS

  • Penn Valley Campus-Engineering Technology Center
  • Renovation & Addition
  • 16,000 SF
  • $7 million

An integrated fabrication lab brings forth many opportunities for engineering majors, art majors and the surrounding community.

Metropolitan Community College is relocating the Engineering Technology program from the Business and Technology Campus to the Penn Valley Campus to increase utilization of their existing building and create synergies between the college’s graphic design diagram and the engineering technology program.

Functions such as the fabrication lab and the 3D printing lab offer regular opportunities for students to collaborate, ideate and prototype in a shared space that will now be available to the graphic design program housed in the current Carter Arts Building. The physical placement of the program on the south edge of the Penn Valley campus is seen as a means of being a visible and usable asset to the community from which they can also access tools and technical expertise provided by talented and industry-connected faculty. In addition, it will feature a double-height space for the fabrication lab with greater connectivity to the exterior environment through the use of extensive glazing and covered outdoor spaces offering students their choice of environments in which to create.

Briarwood Elementary School

Briarwood Elementary School

PRAIRIE VILLAGE, KANSAS

  • Shawnee Mission School District
  • New Construction
  • 72,000 SF
  • $16.7 million

The walls come alive to inspire young learners at this new school. Whimsical landscapes and playful typography encourage students to open their minds to new possibilities.

Focusing on brain-based learning, every space at this new elementary school accommodates experiential learning. Corridors are learning spaces, with seating for large and small-group collaboration and integrated technology.

Safety was a paramount concern throughout the design and construction because this new elementary school was built next to the existing facility, which stayed open and operational throughout construction. Careful coordination between the District, our team and JE Dunn’s construction team was paramount to ensure students and faculty at the existing school stayed safe and secure.

Cassell Park Elementary School

CASSELL PARK ELEMENTARY SCHOOL

INDEPENDENCE, MISSOURI

  • Independence School District
  • New Construction
  • 69,000 SF
  • $20 Million

Complete project integration, from architectural design to brand development. 

The Independence School District needed a new elementary school to prevent overcrowding and eliminate all mobile trailers used in the district. Named after a community landmark and prestigious community figure, students and staff now have a permanent place to call home at Cassell Park Elementary.

Now Home of the Knights, students and teachers take pride in their newly branded identity, which is displayed throughout the school through prominent graphics. Just like a knight, the school represents a safe, protective space while exploring a more collaborative, flexible approach to learning.

Cassell Park is the first elementary in the district to pilot Project Lead the Way into its curriculum. A makerspace is seamlessly integrated into the media center with a retractable door, making hands-on learning visible for all to see.

Independence Uptown Market

Independence Uptown Market

INDEPENDENCE, MISSOURI

  • New Construction
  • 6,700 SF
  • $3.3 million

A revitalized downtown area offers a venue for farmers, citizens and small business owners to gather.

The Independence Uptown Market is the combined vision of citizens, farmers and business owners brought from idea to reality within the span of 18 months. An open-air pavilion paired with an enclosed farmers market pavilion offer a venue for local craftsmen to sell their goods. The enclosed venue offers the opportunity to host regional events that will bring commerce into the city, as well as weddings, parties and corporate events. The new building revitalizes the central area and offers a collaborative gathering space that will benefit citizens and business owners alike for years to come and fosters a sense of community.