Liberty North High School

Liberty North High School Additions

LIBERTY, MISSOURI

  • Liberty Public Schools
  • Additions
  • 42,000 SF total
  • $9 million

This addition embraces a new way of learning for the District. Flexible learning spaces create a culture of collaboration that is unlike any other part of the building.

The existing high school is a traditional learning environment with conventional classrooms that branch off central corridors. With the two-story addition, the District wanted to do more with less – more opportunities for learning in the smaller addition. So, every space is a space for learning. Corridors include furniture that can be used for break-out groups or one-on-one instruction, and classrooms are highly flexible to encourage a variety of teaching styles.

Summit Ridge Middle School

Summit Ridge
Summit Ridge

Summit Ridge Middle School

LITTLETON, COLORADO

  • Jefferson County Public Schools
  • Addition/Renovation
  •  13,000 SF
  • $4.8 million

Visual connectivity and strategically designed collaborative spaces have led to an evolution of learning styles at this newly combined middle school. 

Jeffco Public Schools in Denver, Colorado recently decided to transition their sixth-grade students into middle-school, and needed to accommodate for the addition of 400 students. The existing building hosted traditional classrooms and learning areas, challenging the design team to seamlessly integrate the two buildings while incorporating collaborative learning elements into the addition. Hollis + Miller worked directly with the principal, faculty, community members, and students to create a design that would introduce collaboration spaces and a learning stair alongside new classrooms and science labs. Renovations to the school’s STEAM classrooms allow more students access to hands on education with computer aided design, engineering, and fabrication.

Soaring Heights Elementary School

Soaring Heights Elementary School

JOPLIN, MISSOURI

  • Joplin School District
  • New Construction
  • 66,500 SF total
  • $13.5 million

One-of-a-kind collaborative spaces encourage impromptu idea sharing and intimate one-on-one learning.

The Learning Park, Tree House and Theatre in the Park are all flexible learning spaces unique to Soaring Heights. The flexible design emboldens educators and students to adapt their learning environment to the lesson.

This school replaces the elementary school lost on May 22, 2011, when the worst tornado disaster on record to date in the United States hit the City of Joplin.

Joplin Early Childhood Center

Joplin Early Childhood Center

JOPLIN, MISSOURI

  • Joplin School District
  • New Construction
  • 37,500 SF
  • $8.7 million

After seven years in temporary classrooms, Joplin’s littlest learners finally have a home for learning and exploring. This is “Where it all Begins…”

Teachers can now collaborate together to utilize shared learning centers that are integral to their early education curriculum, rather than having to house these centers in their classrooms, which has freed up space in their rooms for more individual and group learning.

It was important for the Joplin community that their Early Childhood Center feels more like a home than a school to ease the transition for students. This space comes alive thanks to the integration of the environmental graphics. Students and visitors are immersed in a forest of trees and critters. The Learning Grove opens learners’ imaginations with construction and waterplay stations, as well as a tricycle track, blurring the lines between indoor and outdoor learning.

In May 2011, an F-5 tornado struck the city of Joplin, devastating the community. The District’s early childhood center is the last piece of Operation Rebuild.

AWARDS & RECOGNITION

  • IIDA Mid-America – Silver Award in K-12 Education
  • AIA Kansas City – Citation Award in Interior Architecture

Joplin Early Childhood Center

JOPLIN, MISSOURI

  • Joplin School District
  • New Construction
  • 37,500 SF
  • $8.7 million

After seven years in temporary classrooms, Joplin’s littlest learners finally have a home for learning and exploring. This is “Where it all Begins…”

Teachers can now collaborate together to utilize shared learning centers that are integral to their early education curriculum, rather than having to house these centers in their classrooms, which has freed up space in their rooms for more individual and group learning.

It was important for the Joplin community that their Early Childhood Center feels more like a home than a school to ease the transition for students. This space comes alive thanks to the integration of the environmental graphics. Students and visitors are immersed in a forest of trees and critters. The Learning Grove opens learners’ imaginations with construction and waterplay stations, as well as a tricycle track, blurring the lines between indoor and outdoor learning.

In May 2011, an F-5 tornado struck the city of Joplin, devastating the community. The District’s early childhood center is the last piece of Operation Rebuild.

Trailwood Elementary School

Trailwood Elementary School

OVERLAND PARK, KANSAS

  • Shawnee Mission School District
  • New Construction
  • 68,000 SF total
  • $16.9 million

Every space is an opportunity for learning. Described as a “dream school,” Trailwood focuses on hands-on, experiential learning.

Corridors that would traditionally be meant for travel are transformed into work areas with soft seating, tables and easily accessible technology. Accommodating 550 students grades pre-kindergarten through fifth grade, the Principal and community are excited about the possibilities this unique design provides.

Safety was a paramount concern throughout the design and construction because this new elementary school was built next to the existing facility, which stayed open and operational throughout construction. Careful coordination between the District, our team and JE Dunn’s construction team was paramount to ensure students and faculty at the existing school stayed safe and secure.

Hopewell Elementary School

HOPEWELL ELEMENTARY SCHOOL

KANSAS CITY, MISSOURI

  • Park Hill School District
  • New Construction
  • 73,000 SF
  • $18.1 million

Indoor and outdoor exploration are encouraged through colorful environmental graphics, reinforced by nature.

Positioned atop a hill and nestled within trees, Park Hill School District’s new Hopewell Elementary is a sanctuary for discovery. 600 students, grades K-5, have the opportunity to use every square foot inside and out of the building for learning. Traditional hallways have been molded with flexible collaboration spaces to maximize flexibility and efficiency. Every core classroom has their own glass garage door, allowing teachers the opportunity to open into collaboration and project spaces. The art room looks out upon a patio facing the tree line, inspiring creativity in students and spilling natural light into the learning environment. The durable materials used on the exterior of the building will withstand the elements and provide a timeless look for generations of students to come in the future.

Briarwood Elementary School

Briarwood Elementary School

PRAIRIE VILLAGE, KANSAS

  • Shawnee Mission School District
  • New Construction
  • 72,000 SF
  • $16.7 million

The walls come alive to inspire young learners at this new school. Whimsical landscapes and playful typography encourage students to open their minds to new possibilities.

Focusing on brain-based learning, every space at this new elementary school accommodates experiential learning. Corridors are learning spaces, with seating for large and small-group collaboration and integrated technology.

Safety was a paramount concern throughout the design and construction because this new elementary school was built next to the existing facility, which stayed open and operational throughout construction. Careful coordination between the District, our team and JE Dunn’s construction team was paramount to ensure students and faculty at the existing school stayed safe and secure.

Grain Valley High School

GRAIN VALLEY HIGH SCHOOL

GRAIN VALLEY, MISSOURI

  • Grain Valley School District
  • Addition-Phase 4
  • 33,400 SF & 17,600 SF Courtyard
  • $10.2 million

A new face for Grain Valley High School provides a prominent sense of arrival and display of school pride.

Upon arrival at Grain Valley High School, students and visitors are guided in along the impressive, curved, blue CMU wall that begins at the entry and continues throughout the interior, comprising the spine of the building and dubbed “Eagle Way”. The raised entrance increases visibility from the street while improving traffic flow for student drop-off and pick-up.

Similar to a central college campus union, the media center represents the heart of the school, branded by a large glass eagle graphic that is visible from both inside and out. Glass dividers promote connectivity to the lecture hall, makerspace and small group collaboration rooms while providing views into the expansive courtyard. Tiered seating in the courtyard provides an outdoor learning area and offers dynamic spaces for students to socialize.

Grain Valley High School is currently home to nearly 1,100 students but is master planned to accommodate up to 1,600 high school students in the rapidly growing community. While working with the district throughout a five-phase master plan, Hollis + Miller became very familiar with the goals and priorities of the district and community.

Ellen Ochoa Elementary School

Ellen Ochoa Elementary School

TULSA, OKLAHOMA

  • Union Public Schools
  • New Construction
  • 133,000 SF total
  • (Phase I: 70,000 SF, Phase 2: 14,000 SF., Phase 3: 49,000 SF)
  • $31 million

A tight-knit community centers around the new Ellen Ochoa Elementary.

This new school is deeply embedded in its surrounding neighborhoods, with the majority of the population living within a one-mile radius of the school. Spaces for community events, including open gyms, adult education and a community garden and kitchen, where parents and students can learn to grow and cook together.

The educational spaces open out into shared collaboration spaces and the central media space, blurring the lines of the traditional definition of a classroom. Classrooms incorporate a shared “Dream Space” dedicated to focused learning and small-group work.

Named after astronaut Dr. Ellen Ochoa, this elementary school is unlike any other in the district.

Walden Middle School

Walden Middle School

KANSAS CITY, MISSOURI

  • Park Hill School District
  • New Construction
  • 114,500 SF
  • $34.4 million

Visual connectivity and strategically designed collaborative spaces have led to an evolution of learning styles at this newly combined middle school. 

Driving up to the building, you immediately feel the sense of space and pride created by Walden Middle School. Exterior signage and artwork can be illuminated with interchangeable colors to celebrate special occasions and holidays. The space was designed and built to give students access to outside daylight, while also ensuring safety and security as well as the durability of the building. This feeling of openness and transparent connectivity has attributed to the lack of bullying, according to the principal. Lockdown features also can be activated at the push of a button, securing 75 percent of the building.

In addition, the three academic wings are flexible and include operable walls, allowing for customization and collaboration throughout. The wings are connected by the gallery-like commons, where students’ work can be showcased, as well as the media center. The green building is seeking LEED V4 certification to demonstrate how the design played a crucial role in extending the building’s life cycle while incorporating impactful and sustainable features.