St. Elizabeth Early Childhood Center

St. Elizabeth Early Childhood Center

KANSAS CITY, MISSOURI

  • St. Elizabeth Catholic School
  • Renovation/Addition
  • 20,000 SF
  • $4 million

DIOCESE OF KANSAS CITY-ST. JOSEPH CATHOLIC SCHOOLS

For years, the St. Elizabeth Early Childhood Center has been located across a heavy-traffic street from the Catholic Church, calling for their youngest students to journey back and forth multiple times a day. Hollis + Miller designed a master plan for the Church, putting high priority on uniting the Early Childhood Center, K-8 school and the Catholic Church on the same side of the street. The new design does just that, providing peace of mind for staff and parents, and also allows opportunities for growth and adaptations in the future.

The renovated rectory building will host eight new classrooms for infants through kindergarten students. The rectory, a residential home for members of the clergy, challenged the design team to develop innovative solutions to transform the space into a learning environment. The design incorporates research-based learning tools and showcases a touch of tradition with the existing stone walls of the rectory, as well as the connecting Church. The new early childhood center will feature a learning stair and sliding classroom walls for co-teaching, shared storage areas and indoor/outdoor collaboration spaces to expand fine motor skills. A large balcony will serve as a flexible commons area and gathering space for students, staff and parish members.

*Photos courtesy of Straub Construction

Northwest Missouri State University Athletic Locker Rooms

Northwest Missouri State University

IN PROGRESS

  • Athletic Locker Rooms
  • Maryville, Missouri
  • Renovation
  • 5,500 SF

Northwest Missouri State University aims to reimagine its existing football locker room space to create a destination where players, coaches, recruits and the community could feel a prideful connection to the university.

With a strong focus on brand identity and school pride, the main space of the locker room boasts a number of brand elements, including a large, illuminated Bearcat ceiling logo within a carefully coordinated pattern of football field markings. The design team brought innovative thinking regarding locker exhaust design to alleviate odors within the space and also upgraded restrooms, showers and the equipment room. Focusing on the notion of family, a large open area provides players and coaches the opportunity to socialize and come together during gameday and non-gameday scenarios. The end result will be a new home for Bearcat Football and the larger Maryville community.

Carpenters’ Union Training Facility

Kansas City – St. Louis Carpenters’ Training Facility

KANSAS CITY, MISSOURI

  • Adaptive Reuse
  • 68,000 SF
  • $5.7 million

Apprentices and instructors have the room and storage they need for all their trades to learn in this new training facility. 

Moving from an older, smaller space to an adapted former big box store gave the Carpenters Union not just the right amount but the right type of space to combine its training facility with its regional offices. Apprentices split their time between classrooms and the workshop, so every classroom is physically or visually connected to the workshop. Large graphics make the room numbers easily visible from anywhere in the facility.

This facility also serves as the regional office for the Carpenters Union of Kansas City – St. Louis. The front of the space features an administrative suite, and the facility also has the ability to open up for public events including community meetings and political rallies.

IDEA Space KC – The Barstow School

IDEA SPACE KC

IN PROGRESS

  • Adaptive Reuse
  • 63,000 SF
  • $14.5 million

Once a large grocery store, an expansive retail building will be transformed into an Early Childhood Center, as well as other various educational support spaces.

It takes vision to look at an existing retail store and picture a learning environment in its place, but that is exactly the innovative vision that The Barstow School had in mind. The Early Childhood Center entrance will be where the previous pharmacy operated, utilizing the covered pharmacy drop-off area for a dedicated secure covered entry. Flexible program spaces such as a STEAM workshop and lab, a maker space, black box theater, café and collaborative space will fill the rest of the building, serving as a resource for the Barstow community.

Due to existing site constraints, there is no room for an outdoor playground around the building. Instead, as a secure and innovative solution, there will be an outdoor courtyard placed in the middle of the building. This opens doors for controlled outdoor learning experiences and adds natural daylighting through adjacent glazed windows into classrooms. The wide indoor play area will host a sensory table and a commons collaboration area that bleeds into built-in manipulative nooks.

fnlcommons1
fnloutdoor

Three Trails Preschool

Three Trails Preschool

RAYTOWN, MISSOURI

  • Raytown Quality Schools
  • Renovation
  • 32,600 SF
  • $2 million

Young learners are immersed in a bright, positive environment from the moment they enter this revamped environment. 

Each space comes alive with colorful nature scenes featuring animal friends on every wall. Students feel engaged and excited to learn in this updated learning environment. This abandoned Catholic school was given new life for its students and teachers.

Raytown Quality Schools was looking to expand its early childhood program after the overwhelming success of its first pre-kindergarten facility. Reimagining the interior of this tired school allows more preschool students the opportunity to start learning earlier, which research has shown leads to improved success throughout their academic and professional lives.

Hopewell Elementary School

HOPEWELL ELEMENTARY SCHOOL

KANSAS CITY, MISSOURI

  • Park Hill School District
  • New Construction
  • 73,000 SF
  • $18.1 million

Indoor and outdoor exploration are encouraged through colorful environmental graphics, reinforced by nature.

Positioned atop a hill and nestled within trees, Park Hill School District’s new Hopewell Elementary is a sanctuary for discovery. 600 students, grades K-5, have the opportunity to use every square foot inside and out of the building for learning. Traditional hallways have been molded with flexible collaboration spaces to maximize flexibility and efficiency. Every core classroom has their own glass garage door, allowing teachers the opportunity to open into collaboration and project spaces. The art room looks out upon a patio facing the tree line, inspiring creativity in students and spilling natural light into the learning environment. The durable materials used on the exterior of the building will withstand the elements and provide a timeless look for generations of students to come in the future.

Southeast Missouri State University Greek Village

Southeast Missouri State University Greek Village

CAPE GIRARDEAU, MISSOURI

  • Southeast Missouri State University
  • New Construction
  • 28,000 SF total
  • $9.2 million

Fraternities have a dedicated home that reflects their unique identities while still encouraging inter-fraternal events in the new Greek Village.

This cul-de-sac becomes activated with energy as the Greek community hosts barbecues and events. Students from all over campus are drawn to this new space. While all four homes are the same size and similar layout, each one is tailored to each fraternity’s unique culture and traditions. They feature traditional, ornate spaces that represent the tradition and history of their organizations.

Greek housing is a part of campus housing on SEMO’s campus, but the fraternities and sororities were housed in aging facilities. This is the first phase of relocating the Greek community to updated homes.

Colorado SKIES Academy

COLORADO SKIES ACADEMY

  • Centennial, Colorado
  • New Construction
  • 23,000 SF
  • $7 million

The STEM curriculum and project-based learning introduces young students to aviation early on.

Colorado Skies Academy is a new Charter School for grades 6–8, located at the Centennial Airport in Centennial, CO. The two-story, 23,000-square-foot facility is also affiliated with the adjacent Wings Over the Rockies Aviation Museum housing over 50 vintage military aircraft.

The project-based learning/STEM curriculum is flight-based, teaching students many different facets of aviation, and is supplemented by a focus on social-emotional development. The learning environment itself supports each of these endeavors. The Exploratorium allows students to collaborate in groups or complete individual work in a setting inspiring out-of-the-box thinking, while active corridors offer a choice in learning spaces. The unique shape of the Exploratorium resembles a rocket booster, and vibrant graphics project the aviation and aerospace theme throughout. The Spread Your Wings program flies in teachers from Colorado’s front range for exposure to the program as professional development and in turn, introduces students to experts in the industry.

Chillicothe Elementary School

CHILLICOTHE ELEMENTARY SCHOOL

CHILLICOTHE, MISSOURI

  • Chillicothe R-II School District
  • New Construction
  • 60,000 SF
  • $13.9 Million

The community’s youngest learners thrive in their updated, interactive space.

Infants through first graders are excited to be in one, new building that encourages students to connect with the natural environment around them. Interior design and environmental graphics make this space come alive and encourage these little learners to imagine. It also helps these little learners to understand what a space’s purpose is without traditional wayfinding signage that they wouldn’t be able to read. The various learning environments include large instruction, small group and one-on-one.

The rural community of Chillicothe, Missouri, is committed to making big changes for their students. This new elementary school is just the first step in the District’s plan to get all their elementary school students in one new building and all their students on one campus around their high school.

Grain Valley High School

GRAIN VALLEY HIGH SCHOOL

GRAIN VALLEY, MISSOURI

  • Grain Valley School District
  • Addition-Phase 4
  • 33,400 SF & 17,600 SF Courtyard
  • $10.2 million

A new face for Grain Valley High School provides a prominent sense of arrival and display of school pride.

Upon arrival at Grain Valley High School, students and visitors are guided in along the impressive, curved, blue CMU wall that begins at the entry and continues throughout the interior, comprising the spine of the building and dubbed “Eagle Way”. The raised entrance increases visibility from the street while improving traffic flow for student drop-off and pick-up.

Similar to a central college campus union, the media center represents the heart of the school, branded by a large glass eagle graphic that is visible from both inside and out. Glass dividers promote connectivity to the lecture hall, makerspace and small group collaboration rooms while providing views into the expansive courtyard. Tiered seating in the courtyard provides an outdoor learning area and offers dynamic spaces for students to socialize.

Grain Valley High School is currently home to nearly 1,100 students but is master planned to accommodate up to 1,600 high school students in the rapidly growing community. While working with the district throughout a five-phase master plan, Hollis + Miller became very familiar with the goals and priorities of the district and community.