Ellen Ochoa Elementary School

Ellen Ochoa Elementary School

TULSA, OKLAHOMA

  • Union Public Schools
  • New Construction
  • 133,000 SF total
  • (Phase I: 70,000 SF, Phase 2: 14,000 SF., Phase 3: 49,000 SF)
  • $31 million

A tight-knit community centers around the new Ellen Ochoa Elementary.

This new school is deeply embedded in its surrounding neighborhoods, with the majority of the population living within a one-mile radius of the school. Spaces for community events, including open gyms, adult education and a community garden and kitchen, where parents and students can learn to grow and cook together.

The educational spaces open out into shared collaboration spaces and the central media space, blurring the lines of the traditional definition of a classroom. Classrooms incorporate a shared “Dream Space” dedicated to focused learning and small-group work.

Named after astronaut Dr. Ellen Ochoa, this elementary school is unlike any other in the district.

Briarwood Elementary School

Briarwood Elementary School

PRAIRIE VILLAGE, KANSAS

  • Shawnee Mission School District
  • New Construction
  • 72,000 SF
  • $16.7 million

The walls come alive to inspire young learners at this new school. Whimsical landscapes and playful typography encourage students to open their minds to new possibilities.

Focusing on brain-based learning, every space at this new elementary school accommodates experiential learning. Corridors are learning spaces, with seating for large and small-group collaboration and integrated technology.

Safety was a paramount concern throughout the design and construction because this new elementary school was built next to the existing facility, which stayed open and operational throughout construction. Careful coordination between the District, our team and JE Dunn’s construction team was paramount to ensure students and faculty at the existing school stayed safe and secure.

Woodrow Wilson Academy

Woodrow Wilson Academy

WESTMINSTER, COLORADO

  • Renovation & Additions
  • 13,500 SF
  • $4.5 million

Middle school students feel like they have their own space to learn and grow separate from the elementary school students. Their new space supports expanded student collaboration and project-based learning.

Students can collaborate in the new classrooms with glass walls that provide ample daylight and open up to accommodate large and small-groups, including to the outdoors, encouraging classes to spill outside for learning and experimenting. This flexibility continues into the new dining commons, which features a variety of seating options, giving students more freedom.

University of St. Mary Athletics

University of St. Mary Athletics

LEAVENWORTH, KANSAS

  • University of St. Mary
  • New Construction

Athletics take center stage at University of St. Mary. With 75% of the student population being athletes, they needed a complex that could host all its athletes and fans on campus.

The complex’s inaugural homecoming celebration was the largest game day attendance in school history, with students, faculty, alumni, family and friends all coming together to celebrate the its Athletics new home.

A soccer field and synthetic turf football field are joined by a two-sided press box with hospitality area. Locker rooms, concessions and a multipurpose space are housed on the first floor of the press box.

Jackson College

Jackson College Campus View 3

JACKSON, MICHIGAN

  • New Construction
  • 71,000 SF total
  • $10 million

Every student can now have a home on campus with the addition of two new residence halls.

With community spaces and computer labs on each floor and extra-large closets to hold athletic equipment, Campus View 3 accommodates all students. Two residence halls house 200 students in two- and four-bedroom suites, creating a welcome addition to the campus’s existing residence halls.

Glen Oaks Community College

Glen Oaks Community College David H. & Patricia A. Devier Student suites

CENTREVILLE, MICHIGAN

  • New Construction
  • 41,000 SF total
  • $6.5 million

Students live on campus for the first time.

Research shows that students who live on campus are more successfully academically because it is easier for them to connect to their peers and develop strong study habits. Nestled in a treed hillside, the 108-bed residence hall’s two-and four-bedroom suites have a breathtaking view of the wooded landscape. Each suite includes a full shared kitchen, bathrooms and a furnished living room.

Colorado Military Academy

military academy
Colorado Military Academy

Colorado Military Academy

COLORADO SPRINGS, COLORADO

  • Phase 1: 44,000 SF
  • Total Building Size: 88,000 SF
  • Master Plan new addition: 48,000 SF
  • $3.2 million

Cadets cannot tell their collaborative environment is housed in a former office building. Perfectly positioned among the surrounding five military installations, cadets receive a one-of-a-kind STEM education focused on leadership and integrity.

Collaboration and break-out zones are integrated together throughout the school to allow teachers to expand learning outside of the traditional classroom. Learners can explore new ideas and work on projects in various group sizes. This design helps the Academy to push its vision further to encourage cadets to think globally.

The Academy currently supports grades kindergarten through eighth and will continue to grow by a grade level each year to 12th grade.

Trailwood Elementary School

Trailwood Elementary School

OVERLAND PARK, KANSAS

  • Shawnee Mission School District
  • New Construction
  • 68,000 SF total
  • $16.9 million

Every space is an opportunity for learning. Described as a “dream school,” Trailwood focuses on hands-on, experiential learning.

Corridors that would traditionally be meant for travel are transformed into work areas with soft seating, tables and easily accessible technology. Accommodating 550 students grades pre-kindergarten through fifth grade, the Principal and community are excited about the possibilities this unique design provides.

Safety was a paramount concern throughout the design and construction because this new elementary school was built next to the existing facility, which stayed open and operational throughout construction. Careful coordination between the District, our team and JE Dunn’s construction team was paramount to ensure students and faculty at the existing school stayed safe and secure.

St. Michael the Archangel Catholic High School

St. Michael the Archangel Catholic High School

LEE’S SUMMIT, MISSOURI

  • Diocese of Kansas City – St. Joseph
  • New Construction
  • 90,000 SF
  • $25 million
  • Religious Design Partner: SFS Architecture

Traditional values meet innovative learning where students get a well-rounded education in a space that marries religious teachings with brain-based learning.

This new Kansas City Diocese school combines the former St. Mary’s and Archbishop O’Hara high schools into one cohesive learning environment. A large atrium connects the chapel and academic spaces with a two-story learning stair, which encourages collaboration and community. The classrooms’ traditional style is complemented by flexible furniture that allow the spaces to adapt to each day’s teaching schedule.

Soaring Heights Elementary School

Soaring Heights Elementary School

JOPLIN, MISSOURI

  • Joplin School District
  • New Construction
  • 66,500 SF total
  • $13.5 million

One-of-a-kind collaborative spaces encourage impromptu idea sharing and intimate one-on-one learning.

The Learning Park, Tree House and Theatre in the Park are all flexible learning spaces unique to Soaring Heights. The flexible design emboldens educators and students to adapt their learning environment to the lesson.

This school replaces the elementary school lost on May 22, 2011, when the worst tornado disaster on record to date in the United States hit the City of Joplin.