Summit Ridge Middle School

Summit Ridge
Summit Ridge

Summit Ridge Middle School

LITTLETON, COLORADO

  • Jefferson County Public Schools
  • Addition/Renovation
  •  13,000 SF
  • $4.8 million

Visual connectivity and strategically designed collaborative spaces have led to an evolution of learning styles at this newly combined middle school. 

Jeffco Public Schools in Denver, Colorado recently decided to transition their sixth-grade students into middle-school, and needed to accommodate for the addition of 400 students. The existing building hosted traditional classrooms and learning areas, challenging the design team to seamlessly integrate the two buildings while incorporating collaborative learning elements into the addition. Hollis + Miller worked directly with the principal, faculty, community members, and students to create a design that would introduce collaboration spaces and a learning stair alongside new classrooms and science labs. Renovations to the school’s STEAM classrooms allow more students access to hands on education with computer aided design, engineering, and fabrication.

Walden Middle School

Walden Middle School

KANSAS CITY, MISSOURI

  • Park Hill School District
  • New Construction
  • 114,500 SF
  • $34.4 million

2021 A4LE John Shaw Award Recipient

Visual connectivity and strategically designed collaborative spaces have led to an evolution of learning styles at this newly combined middle school. 

Driving up to the building, you immediately feel the sense of space and pride created by Walden Middle School. Exterior signage and artwork can be illuminated with interchangeable colors to celebrate special occasions and holidays. The space was designed and built to give students access to outside daylight, while also ensuring safety and security as well as the durability of the building. This feeling of openness and transparent connectivity has attributed to the lack of bullying, according to the principal. Lockdown features also can be activated at the push of a button, securing 75 percent of the building.

In addition, the three academic wings are flexible and include operable walls, allowing for customization and collaboration throughout. The wings are connected by the gallery-like commons, where students’ work can be showcased, as well as the media center. The green building is the first LEED V4 certified school building in the region and demonstrates how the design played a crucial role in extending the building’s life cycle while incorporating impactful and sustainable features.

Olathe West High School

Olathe West High School

OLATHE, KANSAS

  • Olathe USD 233
  • New Construction
  • 375,000 SF
  • $85 million
  • Design Partner: Stantec Architecture

Learning is on display at this one-of-a-kind high school.

From the moment students walk in the door, they’re greeted with the media center and the 21st Century Learning program labs. Student socialization and collaboration are encouraged with two learning stairs connecting academic neighborhoods.

Academic neighborhoods house a variety of spaces from flexible labs to blended learning environments, giving the school a more collegiate feel. No teacher owns their classroom, but rather chooses the environment that will work best for that day’s lesson.

AWARDS & RECOGNITION

  • AIA Kansas – Citation Award in Large Architecture
  • A4LE Midwest Great Lakes – John Shaw Award

Carpenters’ Union Training Facility

Kansas City – St. Louis Carpenters’ Training Facility

KANSAS CITY, MISSOURI

  • Adaptive Reuse
  • 68,000 SF
  • $5.7 million

Apprentices and instructors have the room and storage they need for all their trades to learn in this new training facility. 

Moving from an older, smaller space to an adapted former big box store gave the Carpenters Union not just the right amount but the right type of space to combine its training facility with its regional offices. Apprentices split their time between classrooms and the workshop, so every classroom is physically or visually connected to the workshop. Large graphics make the room numbers easily visible from anywhere in the facility.

This facility also serves as the regional office for the Carpenters Union of Kansas City – St. Louis. The front of the space features an administrative suite, and the facility also has the ability to open up for public events including community meetings and political rallies.

St. James Academy

ST. JAMES ACADEMY

LENEXA, KANSAS

  • Archdiocese of Kansas City-Kansas
  • New Construction
  • 108,000 SF

Located in a growing suburb within the greater Kansas City area, this facility integrates and adapts to changes in education, spirituality and technology.

The Chapel serves as the Heart of the Campus. This statement not only led to the present location of the Chapel, but also a concept of allowing students to be in the Presence of Christ as they experienced the building through visual connections to the Tabernacle. The Chapel is also flexible enough to not only accommodate 200 students, but the entire 800-student population, and still maintain a contiguous space so that they felt like they were apart of the Mass. We accomplished this by combining the allocated space for dining, gathering, and the Chapel into one large common centralized space detailed with similar materials and volume.

st-james-2
St-james-1

Liberty High School Performing Arts Center

LIBERTY HIGH SCHOOL Performing Arts Center

LIBERTY, MISSOURI

  • Liberty Public Schools
  • Addition
  • 43,000 SF
  • $16.5 million

The new performing arts space boasts unique elements contributing to the full performance experience, down to the technical and behind-the-scenes details.

As a district who places a strong emphasis on the importance of arts in education, Liberty Public Schools sought to improve its fine arts facilities at Liberty High School as part of the 2018 district bond passage. The addition of the new state-of-the-art Performing Arts Center brings many opportunities for students, featuring an expansive two-tiered auditorium, flexible band, orchestra and choir rooms, a scene shop, drama classroom, individual rehearsal spaces and an event entrance for performance attendees. All of the spaces were designed to be multi-use to maximize the building’s utilization.

Inspired by spaces such as the Kauffman Center for the Performing Arts, the nearly 800-seat addition is comparable to that of a performance space found on a college campus. Securely connected to the high school, students now have a professional setting to hone their talents. Acoustically accurate architectural details support students in achieving their full creative potential.

Liberty North High School

Liberty North High School Additions

LIBERTY, MISSOURI

  • Liberty Public Schools
  • Additions
  • 42,000 SF total
  • $9 million

This addition embraces a new way of learning for the District. Flexible learning spaces create a culture of collaboration that is unlike any other part of the building.

The existing high school is a traditional learning environment with conventional classrooms that branch off central corridors. With the two-story addition, the District wanted to do more with less – more opportunities for learning in the smaller addition. So, every space is a space for learning. Corridors include furniture that can be used for break-out groups or one-on-one instruction, and classrooms are highly flexible to encourage a variety of teaching styles.

Three Trails Preschool

Three Trails Preschool

RAYTOWN, MISSOURI

  • Raytown Quality Schools
  • Renovation
  • 32,600 SF
  • $2 million

Young learners are immersed in a bright, positive environment from the moment they enter this revamped environment. 

Each space comes alive with colorful nature scenes featuring animal friends on every wall. Students feel engaged and excited to learn in this updated learning environment. This abandoned Catholic school was given new life for its students and teachers.

Raytown Quality Schools was looking to expand its early childhood program after the overwhelming success of its first pre-kindergarten facility. Reimagining the interior of this tired school allows more preschool students the opportunity to start learning earlier, which research has shown leads to improved success throughout their academic and professional lives.