Blue Springs High School

A strategic blend of acoustical features, architectural elements and environmental graphics emulates school pride throughout every detail of the new addition at Blue Springs High School.

Continue reading

Maplewood Elementary School

Bright colors, wood tones and the maple leaf are just a few nods to the school pride that runs deep through generations of students that attended Maplewood Elementary School.

Continue reading

St. James Academy

ST. JAMES ACADEMY

LENEXA, KANSAS

  • Archdiocese of Kansas City-Kansas
  • New Construction
  • 108,000 SF

Located in a growing suburb within the greater Kansas City area, this facility integrates and adapts to changes in education, spirituality and technology.

The Chapel serves as the Heart of the Campus. This statement not only led to the present location of the Chapel, but also a concept of allowing students to be in the Presence of Christ as they experienced the building through visual connections to the Tabernacle. The Chapel is also flexible enough to not only accommodate 200 students, but the entire 800-student population, and still maintain a contiguous space so that they felt like they were apart of the Mass. We accomplished this by combining the allocated space for dining, gathering, and the Chapel into one large common centralized space detailed with similar materials and volume.

st-james-2
St-james-1

Chillicothe Elementary School

CHILLICOTHE ELEMENTARY SCHOOL

CHILLICOTHE, MISSOURI

  • Chillicothe R-II School District
  • New Construction
  • 60,000 SF
  • $13.9 Million

The community’s youngest learners thrive in their updated, interactive space.

Infants through first graders are excited to be in one, new building that encourages students to connect with the natural environment around them. Interior design and environmental graphics make this space come alive and encourage these little learners to imagine. It also helps these little learners to understand what a space’s purpose is without traditional wayfinding signage that they wouldn’t be able to read. The various learning environments include large instruction, small group and one-on-one.

The rural community of Chillicothe, Missouri, is committed to making big changes for their students. This new elementary school is just the first step in the District’s plan to get all their elementary school students in one new building and all their students on one campus around their high school.

Brookwood Elementary School

BROOKWOOD ELEMENTARY SCHOOL

LEAWOOD, KANSAS

  • Shawnee Mission School District
  • New Construction
  • 76,800 SF
  • $17.3 Million

The walls and floors come to life as avenues for learning and exploration.

Home to over 550 students, the Brookwood Beaver pride shines through in the building’s design. The original mascot, Oscar, is incorporated throughout the building, a nod to proud alumni of the previous Brookwood Elementary School. A mixture of colors and texture mimic those found in nature, and you’ll find a beaver den nestled under the learning stairs that provides a special place for students to socialize or study.

The built environment at Brookwood encourages learning through exploration. As students make their way through the corridors, subtle wayfinding cues and interactive environmental graphics inspire student engagement and spark inquiry. Beyond the interior walls are learning tools integrated onto the building’s façade – a central sun dial and diagram of the lunar phases.

Blue Valley School District Logistics Center

Blue Valley School District Logistics Center

OVERLAND PARK, KANSAS

  • Blue Valley School District
  • New Construction
  •  51,000 SF
  • $13.6 million

Collaborative long-term planning resulted in the new District Logistics Center, increasing operational efficiency and streamlining resources. 

Designed with the overall goal of enhancing operational efficiency and consolidating resources, the spacious new Logistics Center is now home to some of the district’s most essential operations. Previously located in separate buildings, the industrial print shop, laptop care, and loading dock with a three-story warehouse space are now under one roof. As one piece of a bundle of bond projects for the district, the streamlined efficiency allows for more dollars to be allocated towards learning and student-focused efforts. The print shop allows the district to bring all types of projects in-house, from small print jobs for student worksheets, to large metal signage for school buildings. The site was selected with growth in mind, designed to easily accommodate additions for future expansion and new programs.