Colorado SKIES Academy

COLORADO SKIES ACADEMY

  • Centennial, Colorado
  • New Construction
  • 23,000 SF
  • $7 million

The STEM curriculum and project-based learning introduces young students to aviation early on.

Colorado Skies Academy is a new Charter School for grades 6–8, located at the Centennial Airport in Centennial, CO. The two-story, 23,000-square-foot facility is also affiliated with the adjacent Wings Over the Rockies Aviation Museum housing over 50 vintage military aircraft.

The project-based learning/STEM curriculum is flight-based, teaching students many different facets of aviation, and is supplemented by a focus on social-emotional development. The learning environment itself supports each of these endeavors. The Exploratorium allows students to collaborate in groups or complete individual work in a setting inspiring out-of-the-box thinking, while active corridors offer a choice in learning spaces. The unique shape of the Exploratorium resembles a rocket booster, and vibrant graphics project the aviation and aerospace theme throughout. The Spread Your Wings program flies in teachers from Colorado’s front range for exposure to the program as professional development and in turn, introduces students to experts in the industry.

Compass Montessori School

The impressive compass sculpture hanging from the exposed ceiling of the main corridor serves as a node, providing an interesting gathering space and guiding students to their new “home”, or learning environment.

Continue reading

Boyd Elementary School

Boyd Elementary School

SPRINGFIELD, MISSOURI

  • Springfield Public Schools
  • New Construction
  • 56,000 SF

Greeted by bright colors and a sense of place, visitors, staff and students alike can connect with the rich history of the neighborhood.

Situated in historic midtown Springfield, the new Mary S. Boyd Elementary School replaced an aged facility that had served the community for years. The need for an updated learning environment, the addition of PreK classrooms and the expansion of the school’s widely known International Baccalaureate program fueled the worldly design of the new building. Transdisciplinary connections can be found throughout the corridors, brought together at one central point in Boyd Hall. Boyd Hall serves as the “front porch” for students’ arrival each day, a melting pot of varying cultures, graphics and colors. Built to serve internationally-minded learners, Boyd Elementary is home for a diverse community and a safe haven for all.

Glen Oaks Community College

Glen Oaks Community College David H. & Patricia A. Devier Student suites

CENTREVILLE, MICHIGAN

  • New Construction
  • 41,000 SF total
  • $6.5 million

Students live on campus for the first time.

Research shows that students who live on campus are more successfully academically because it is easier for them to connect to their peers and develop strong study habits. Nestled in a treed hillside, the 108-bed residence hall’s two-and four-bedroom suites have a breathtaking view of the wooded landscape. Each suite includes a full shared kitchen, bathrooms and a furnished living room.

Van Horn High School

VAN HORN HIGH SCHOOL

INDEPENDENCE, MISSOURI

  • Independence School District
  • Addition + Remodel
  • 42,000 SF
  • $17 million

The addition posed the opportunity to create an enhanced sense of place, identity and pride for Van Horn’s students, staff and community.

Walking into the new addition, you’re welcomed by the Hall of Champions, showcasing the rich Van Horn history with team trophies, medals and plaques. A new competition gym elevates the Falcon fan and athlete experience, while also providing enhanced locker room facilities for athletes. New indoor/outdoor concessions and restrooms for indoor sporting events and soccer games are arranged with the hope to provide future infrastructure to bring varsity football games back to campus. A large mezzanine accommodates standing room spectators and dually functions as a practice space for wrestlers, cheerleaders and more.

Beyond athletics, the new addition includes a culinary arts kitchen, a metals workshop and full-service athletic training room, with accompanying classrooms to support those hands-on learning labs. These 21st century equipped spaces demonstrate the District’s commitment to the Independence Careers Academies.

Formerly disconnected from the building itself, the woodshop was brought back into the building by demolishing an existing structure and renovating a former storage space. In addition to the woodshop, six science labs were remodeled.

Grain Valley High School

GRAIN VALLEY HIGH SCHOOL

GRAIN VALLEY, MISSOURI

  • Grain Valley School District
  • Addition-Phase 4
  • 33,400 SF & 17,600 SF Courtyard
  • $10.2 million

A new face for Grain Valley High School provides a prominent sense of arrival and display of school pride.

Upon arrival at Grain Valley High School, students and visitors are guided in along the impressive, curved, blue CMU wall that begins at the entry and continues throughout the interior, comprising the spine of the building and dubbed “Eagle Way”. The raised entrance increases visibility from the street while improving traffic flow for student drop-off and pick-up.

Similar to a central college campus union, the media center represents the heart of the school, branded by a large glass eagle graphic that is visible from both inside and out. Glass dividers promote connectivity to the lecture hall, makerspace and small group collaboration rooms while providing views into the expansive courtyard. Tiered seating in the courtyard provides an outdoor learning area and offers dynamic spaces for students to socialize.

Grain Valley High School is currently home to nearly 1,100 students but is master planned to accommodate up to 1,600 high school students in the rapidly growing community. While working with the district throughout a five-phase master plan, Hollis + Miller became very familiar with the goals and priorities of the district and community.

Jackson College

Jackson College Campus View 3

JACKSON, MICHIGAN

  • New Construction
  • 71,000 SF total
  • $10 million

Every student can now have a home on campus with the addition of two new residence halls.

With community spaces and computer labs on each floor and extra-large closets to hold athletic equipment, Campus View 3 accommodates all students. Two residence halls house 200 students in two- and four-bedroom suites, creating a welcome addition to the campus’s existing residence halls.

Summit Trail Middle School

Summit Trail Middle School

OLATHE, KANSAS

  • Olathe Public Schools
  • New Construction
  • 140,000 SF
  • $31 million

Learning has no bounds at the new Summit Trail Middle School.

In order to accommodate their growing student population, Olathe Public School’s needed a 10th middle school. Adapted from their most recently completed middle school, Summit Trail provides a familiar and functional space while pushing the boundaries of customized learning.

Open corridors blur the line of circulation and usable space. Located in each learning pod are “genius bars” with fully integrated technology for small group collaboration. Glazing provides transparency from classrooms to common spaces, encouraging breakout participation. Moveable furniture elevates the learning environment by providing students and teachers the flexibility to customize their space at any given moment.